Total power shutdown on 28th March'2021.
*
Deptt./Section:
Electrical
*
Never Expired :
Yes
It has been planned to take total power shut on
2
8/03/2021
to carry out maintenance jobs on switchgear bus-couplers, DC supply system and other control panels which cannot be attended in energised (Power ON) conditions. To carry out this maintenance job,
complete power supply shall remain OFF in all the plants, including Port area, cross country conveyors, township and administration building from 08.00 hrs to 13.00 hrs.
Both the generators are already in stop condition. Both grid line shall also be kept OFF till maintenance of Bus-couplers is over. Only Emergency power supply shall be available from DG sets to critical running equipment as Ammonia Compressor and Fire Pumps. Emergency power shall also be available in plants for emergency lighting, however interruptions may be there. All are requested to plan the jobs accordingly during this period. Even if, any equipment which is critical and critically need power supply may be intimated to concerned plant in-charge at the earliest.
This is for information of all residents of Township.
Thanks and Regards,
…………………
S. K. SHARMA,
DGM (Elect.)
INDIAN FARMERS FERTILISER CO-OPERATIVE LIMITED
Paradeep Unit, Dist. Jagatsinghpur, Odisha - 754142
Tel : 06722 224206
Mobile : +91 7077721573 / +91 9412463840